Overview
Model NO.:SR-BFM
Usage:Cake, Bread
Power Source:Electric
Timing Device:Without Timing Device
Type:Proofing Machine
Voltage:220V
Customized:Customized
Capacity:500kg/Batch
Power:5.5kw
Number of Trays:32*2
Grill Dimension:820*670*1700 mm
Origin:China
Product Description
Bakery Dough Proofer Cabinet
A Fermentation Case (also called a Fermentation Cabinet, Proofing Box, or Dough Proofer) is a controlled environment designed to maintain optimal temperature and humidity levels for fermenting dough, aging meats, culturing dairy, or brewing beverages. It ensures consistent fermentation, which is crucial for texture, flavor, and food safety.
Detailed Photos
Standard equipment does not include baking racks or trays. The factory offers a variety of tray options (such as aluminized deep pans, perforated cake pans, non-stick molds, etc.), each with different unit prices.
Product Parameters
| Number of Trays |
32*2 |
| Voltage |
220V 50Hz single phase |
| Power |
5.5 kw |
| Controlled Temperature |
0~50ºC |
| Grill Dimension |
820*670*1700 mm |
| Overall Dimension |
1800*1180*2050 mm |
Packaging & Delivery
Package Size:190.00cm * 130.00cm * 220.00cm
Gross Weight:600.000kg
Package Type:Wooden Case
Production & Quality Control
Frequently Asked Questions
This is my first time to import, how can I get the machine?
After you confirm the machine to order and pay, we can help you to deliver the machine to your nearest seaport or airport, or door to door to you by express. We are very experienced in international logistics.
When can I get the price?
We usually quote within 24 hours after we get your inquiry. If you are very urgent to get the price, please notify us so that we will regard your inquiry as a priority.
How is the quality of the machine?
Our machine adopts stainless steel materials, 100% copper wire motor, high-quality chains, and imported components. We also provide an extra set of spare parts for free with the machine.
What is the payment method?
We accept most payment methods, including T/T (Telegraphic Transfer), Western Union, L/C (Letter of Credit), and MoneyGram.
What about the delivery date?
Normally we deliver the goods to the port within 7-10 days after receiving the deposit. We will calculate the arrival time based on your specific destination port.
Can the equipment be customized?
Yes, we support customization for voltage, capacity, and specific tray requirements to meet different production needs. Please consult our team for details.